Set the lighting-control brief before decoration
If you want dimming, separate lighting groups or smart controls, describe the result you want before selecting products. Include hallway switching, bedside control and any outside lighting in the plan. The wiring and product requirements need checking together. Decide what should still work simply if an internet connection is unavailable, and agree who supplies and configures the controls. These decisions are easier before walls are closed and decorated.
Keep lighting controls understandable
Describe the routines that matter: entering the house, going upstairs at night, reading in bed or lighting the garden. Ask how the proposed controls support those routines and how normal operation works without an app. Agree whether setup, demonstration and product instructions are included. A useful handover should leave you able to operate the lighting confidently, without depending on a forgotten installer setting.
Your project preparation checklist
- Lighting groups and switch positions
- Proposed control products
- Configuration responsibility
What should be included in the rewire?
Agree the rooms, circuits, socket quantities, lighting positions and fixed-appliance connections in writing. Identify the wiring that will remain and how it will be assessed. Tell us whether the house is occupied and which surfaces need to be retained. Plastering, decoration and floor reinstatement should be expressly included or arranged separately.
A survey and any existing electrical reports help establish whether full rewiring, partial replacement or smaller alterations are appropriate. The age of the house alone does not settle that decision. Read our guide to signs that wiring needs checking if you are unsure what to report.
Commercial property rewiring in Hornchurch
A Hornchurch shop or salon refit should consider staff control of lighting as well as the finished appearance. Set out opening, cleaning and closing routines so control positions and lighting groups support normal use.
Explore our commercial rewiring service or read Shop rewiring: plan the electrical work before fit-out.

Testing, documents and completion
The agreed new installation work is inspected and tested, with appropriate installation certification and schedules. Building Regulations compliance documentation is also required where notification applies. Ask which records you will receive and keep them for future maintenance or alterations. An EICR assesses an existing installation; it is not a replacement for certification of a new rewire.
Request a quotation in Hornchurch
Send the postcode, property type, floor plans if available, intended work and access dates. Photographs of rooms and the closed consumer unit are useful starting points; please do not remove electrical covers. We will discuss the next assessment step and an agreed scope before booking.


