Electrical work only
The quote identifies the access and chasing needed. You arrange any plastering, decoration and floor repairs that are not listed.
Planning an extension or major alteration in Epping? We provide full and partial house rewiring, with the existing installation and proposed building layout considered together before new circuits are designed.
Read our customers’ feedback · Check NAPIT registration 64714

| Property | Starting price excluding VAT | Starting total including 20% VAT |
|---|---|---|
| 1–2-bedroom flats and bungalows | From £4,000 + VAT | From £4,800 |
| 3–4-bedroom flats and bungalows | From £4,500 + VAT | From £5,400 |
| 1–2-bedroom houses | From £4,500 + VAT | From £5,400 |
| 3-bedroom houses | From £5,000 + VAT | From £6,000 |
| 4-bedroom houses | From £6,000 + VAT | From £7,200 |
| Outbuildings | From £750 + VAT | From £900 |
These are starting prices. Your written quotation confirms the agreed scope, fittings and final price. Optional plastering, decoration and making good are included only where expressly listed. Other property sizes are quoted individually.
An extension can change how the whole home is used. Share the proposed floor plan, heating arrangements and appliance schedule so the electrical work can be assessed as a connected installation. New rooms do not automatically require a complete house rewire, but the suitability of retained circuits and protective equipment must be checked before relying on them.
Mark sockets, switches, lighting and appliance connections on a current drawing. Think about door swings, furniture and kitchen units, rather than choosing positions on an empty wall. If structural openings or ceiling heights change, tell the electrical team before cables are installed. Keep one agreed version of the drawing so the builder, kitchen supplier and electrician work to the same layout.
The electrical quotation should explain the agreed installation, fittings and testing. Clarify who creates access openings, reinstates surfaces and arranges final decoration. Tell us which items you are supplying and when they will arrive. A missing light fitting or delayed kitchen can affect final connections even after the main wiring has been installed.
It may be possible if assessment shows it is suitable for continued use and compatible with the proposed work. The decision should follow inspection, not a blanket rule.
Changes may be possible, but they can alter cable routes, programme and price. Agree any change before the work is carried out.
Include your postcode and a brief description of the work. Take photographs from a safe position with electrical covers closed. You can send optional photographs on WhatsApp; please leave out sensitive personal information.

The agreed work normally includes planning, cable installation, accessories and verification. A full rewire requires an Electrical Installation Certificate; the documentation for other work depends on its scope. We explain the applicable Building Regulations notification. Read our house rewiring service guide for the shared process and Electrical Safety First’s certification guidance for independent information.
Call us with your postcode and fault details. We’ll confirm availability, call-out arrangements and an estimated attendance time.
The quote identifies the access and chasing needed. You arrange any plastering, decoration and floor repairs that are not listed.
Ask for a separate package for agreed cable chases and openings. We confirm the areas, preparation and finish before booking.
Whole-wall or room plastering can be discussed alongside the rewire. Scope, price and timing are agreed separately; decorating is included only if expressly listed.
Only if the written quotation expressly includes it. We can price optional patch repairs or wider plastering alongside the electrical work. Ask separately about decoration and floor repairs.
No. Bedroom count and property type give the starting price. The final quotation depends on fixtures and fittings, the number of power and lighting locations, lighting type such as ceiling roses or spotlights, en suites, extra reception rooms, security lighting, CCTV, access, loft access and whether walls are stud construction or brickwork.
Plan TV power, concealed cables, accessible LED drivers and socket positions before the wall is closed. Coordinate the electrical first fix with Essex Home Media Walls for the complete media wall design and build.
A garden office needs a designed supply for its distance and loads, with earthing, protection, the cable route and any trenching agreed first. For the building and its electrical plan, speak to Essex Home Garden Rooms.
Tell us what you need. We’ll help you take the next step.