Planning capacity for an extension
New rooms and appliances can alter the distribution requirements. The number and type of protective devices should follow the circuit design. Leaving room for sensible additions is useful, but does not remove the need to assess future loads.
Assessing the board and connected circuits
The proposed board must suit the installation, with relevant checks of the circuits, earthing and bonding. We agree the equipment and any associated repairs before replacement. Testing, circuit identification and installation documentation form part of completing the work. A new enclosure is not a repair for every defect elsewhere in the wiring.
Questions worth discussing before booking
Replacing damaged equipment
Heat damage, burning smells or visible deterioration need assessment before a replacement is specified. The cause may involve a connection, protective device or connected circuit. Replacing the enclosure alone would not establish that the underlying problem has been resolved.
Coordinating with solar or battery systems
Additional energy sources affect isolation and the installation records. Tell us about generation or storage equipment before the board is specified. The work may need coordination with the relevant installer and cannot be treated as a standard single-supply swap.
Request consumer unit replacement in Chelmsford
Send the extension layout and the proposed cooking, heating and other electrical equipment. Include your postcode and preferred timing. Photographs should be taken only from a safe position; do not open electrical equipment.
Send your enquiry or message us on WhatsApp. For urgent faults, call 07496 559464 to check availability.





